Click on “Download PDF” for the PDF version or on the title for the HTML version.


If you are not an ASABE member or if your employer has not arranged for access to the full-text, Click here for options.

Procedures for Evaluating Undesigned Manure Transfer Systems in New York State

Published by the American Society of Agricultural and Biological Engineers, St. Joseph, Michigan www.asabe.org

Citation:  2010 Pittsburgh, Pennsylvania, June 20 - June 23, 2010  1008579.(doi:10.13031/2013.29659)
Authors:   Peter E Wright, Curt A Gooch, Andrew W Wedel, Larry D Geohring
Keywords:   Conservation practice evaluation, CAFO, Manure transfer

On-farm manure and wastewater transfer systems may have been installed without being designed by a qualified professional. According to the NYS Education Department, Waste Transfer Systems are required to be designed by an engineer licensed to practice in New York State (PE) or by a Natural Resources Conservation Service (NRCS) employee with appropriate job approval authority. The New York State Concentrated Animal Feeding Operation permit requires that all agricultural waste management plans meet NRCS standards and comply with appropriate state laws. The permit specifically requires that all permanent waste transfer structures that were not installed under the direction of a PE or NRCS employee with the appropriate job approval authority be evaluated by a PE by 3/31/2011.

(Download PDF)    (Export to EndNotes)