Click on “Download PDF” for the PDF version or on the title for the HTML version. If you are not an ASABE member or if your employer has not arranged for access to the full-text, Click here for options. Management of an On-Farm Grid-Connected Solar Thermal Electric Power PlantPublished by the American Society of Agricultural and Biological Engineers, St. Joseph, Michigan www.asabe.org Citation: Applied Engineering in Agriculture. 2(2): 228-233. (doi: 10.13031/2013.26746) @1986Authors: Dennis L. Larson Keywords: Alternative energy, On-farm solar plant, Solar energy AN experimental 200 kW grid-connected solar thermal electric power plant, constructed in 1979 on a farm near Coolidge, AZ, was operated for three years to characterize energy performance, determine equipment shortcomings and quantify operating and maintenance requirements. The applicability of such an on-farm solar plant to providing irrigation pumping power was found to depend primarily on operating and maintenance requirements, energy management issues and capital costs. It is concluded that specialized operating and maintenance requirements and high capital costs make on-farm siting of solar power plants unattractive in the United States at present. (Download PDF) (Export to EndNotes)
|